SFO Gate Enhancement

The International Terminal Enhancement (ITE) Partners team is providing Project Management Support Services for overall management and oversight of the Boarding Area A Gate Enhancements Project and other gate enhancement infrastructure projects throughout their lifecycles. The projects will reconfigure Terminal Gates in order to accommodate larger aircraft and higher passenger volume. Each selected gate’s geometry will be reconfigured, requiring paving, striping, fuel system modifications, electrical system modifications, and Passenger Boarding Bridge procurement and installation. No more than one gate will be closed, or downsized below its existing Aircraft Design Group during construction for any Enhancement project. Modifications to existing taxilane geometry and airfield lighting will also be required for projects. The projects will utilize the Design-Build delivery method.

The PMSS team is providing project controls and reporting; project scheduling, budget, and estimating; specialized technical services including passenger boarding bridge, surveying, special systems, electrical, fuel systems, and structural; partnering participation; stakeholder engagement; sustainability review; and project coordination.

As a Joint Venture partner, AGS is leading Resident Engineering services, Cost Estimation, and Office Engineering for the project.

Categories
Project Management

Location
San Francisco, CA

Client
San Francisco International Airport (SFO)